CallSheet BidsVer en españolEspañol

Home

How the bid score works

Every open bid in your sheet gets a fit score out of 100, built from its public notice six ways: whether it names your trade, how long you have to bid, who is allowed to bid, whether a bid bond is required, what stage the notice is at, and how you bid.

The score means fit for a typical small firm in your trade. It is not your chance of winning, and it never looks at your company.

The six checks

Points come from the notice alone. Missing information is never a penalty: it scores the middle.

  1. up to +35

    Fits your trade

    Named in the title or scope of work: full points. Found only through the agency's category: 21.

  2. up to +25

    Time to bid

    Three weeks or more: full points. Two weeks: 20. Under five days: none.

  3. up to +10

    Bid bond

    No bond required: full points. Bond required: none. Not stated: half.

  4. up to +20

    Who can bid

    Open to all firms: full points. A prequalified list takes 10 off, a required license 5, prevailing wage 3.

  5. up to +5

    Stage

    Bid released: full points. Still planned (a notice ahead of the bid): 2.

  6. up to +5

    How you bid

    Sealed bid: full points. Quote or small purchase: 4. Written proposal: 2.

The three bands

Bid it · 80–100

Strong fit. Put it on your bid list.

Look closer · 60–79

Could work. Check scope and deadline first.

Long shot · under 60

Only if it sits right in your sweet spot.

A real example from this week's sheet

From the NYC sheet of Nov 26. Every card in your sheet shows its own points the same way: tap “Why …?”.

CSB General Construction RC Man. & Bronx

Department of Citywide Administrative Services · Due: 2027-01-21

Fits your trade
Fits General contractors (notice says: general construction)
35 / 35
Time to bid
Time to bid: 56 days
25 / 25
Bid bond
Bid bond not stated (check the notice)
5 / 10
Who can bid
Open to all firms
20 / 20
Stage
Open for bids now
5 / 5
How you bid
Sealed bid: lowest qualified price wins
5 / 5
Total95 / 100

What the score is not

What to do next

Check your Bid-Ready Score: New York →Get this week's New York bids, free during the beta

Check your Bid-Ready Score: Texas →Get this week's Texas bids, free during the beta

Questions

Is the score my chance of winning?

No. It means fit for a typical small firm in your trade, read from the public notice. Your price, your record and the competition decide the award, and we see none of that.

Why does the same bid show different scores for different trades?

The first check asks whether the notice names that trade. A curb job scores full trade points for sitework and concrete and fewer for a trade the notice only touches.

What happens when the notice leaves something out?

It scores the middle. A notice that doesn't say whether a bond is required gets half the bond points, and one with no due date gets 12 of 25 for time.

Do Texas and IT bids use the same score?

Yes. NYC Trades, Texas Trades and NYC IT and Cyber use the same six checks and the same points. Only the trade list behind the first check changes.

Can I change how the score works for my company?

Not yet. The Bid-Ready check is the first step toward that: it records what you hold, and a later version will tailor the “who can bid” points to it.

Read next