Port Authority bid results: how many bid and what the low number was
The Port Authority posts preliminary results for its construction bid openings: one PDF per opening, with every bidder and its total. The work is at its bridges, tunnels, airports, PATH, port and World Trade Center sites.
Below are the latest results from the Port Authority's page: how many firms bid, the apparent low number and how far the next bid was above it. Each one links to the Port Authority's own PDF, which is the official record.
Latest results
From the Port Authority's results page, our copy of Nov 15, 2026: 19 contracts bid in the last 12 months. The typical contract drew 3 bidders. On half of them, the next bid was 17% or more above the apparent low bid.
Preliminary results: the Port Authority says the apparent low bidder may not be the firm awarded the contract.
- New York and New Jersey Marine Terminals- Port Rehabilitation Program Via Work Order - APM Wharves 86, 88, 90, 92 and Turntable - Work Order TApparent low: $3,326,835 (next bid 11% higher)No. MFP-664.003T · Opened Nov 12, 2026 · 6 biddersOfficial PDF →
- LaGuardia Airport - Rehabilitation of Taxilane 0Apparent low: $5,319,200 (next bid 2% higher)No. LGA-124.881 · Opened Nov 5, 2026 · 2 biddersOfficial PDF →
- New Jersey Marine Terminals - Building 111 and 1900 Pump ReplacementApparent low: $2,895,934 (next bid 47% higher)No. MFP-684.073 · Opened Oct 6, 2026 · 2 biddersOfficial PDF →
- PATH - Replacement of Fire Main and Associated Components at MacMillan Bloedel BuildingApparent low: $3,599,000 (next bid 9% higher)No. PAT-024.331 · Opened Sep 30, 2026 · 5 biddersOfficial PDF →
- LaGuardia Airport - Rehabilitation of Runway 13-31 and Associated TaxiwaysApparent low: $54,870,634 (next bid 27% higher)No. LGA-124.877 · Opened Sep 24, 2026 · 2 biddersOfficial PDF →
- George Washington Bridge - Replacement of Bridge Tower Transformers and Rehabilitation of Electrical Distribution RoomsApparent low: $6,920,202 (next bid 6% higher)No. GWB-244.306 · Opened Sep 3, 2026 · 3 biddersOfficial PDF →
- Holland Tunnel – Replacement of Medium Voltage TransformersApparent low: $5,976,000 (next bid 17% higher)No. HT-224.209 · Opened Aug 13, 2026 · 3 biddersOfficial PDF →
- PATH – 15th Street Filtration SystemsApparent low: $1,925,220 (next bid 3% higher)No. PAT-024.332 · Opened Jul 21, 2026 · 2 biddersOfficial PDF →
- George Washington Bridge - Maintenance Pavement Repairs Via Work OrderApparent low: $2,478,100 (next bid 125% higher)No. GWB-714.003 · Opened Jul 16, 2026 · 3 biddersOfficial PDF →
- Holland Tunnel - Installation of Storage Facility for Flood Protection EquipmentApparent low: $7,850,000 (next bid 27% higher)No. HT-224.228 · Opened Jul 2, 2026 · 3 biddersOfficial PDF →
🔒 Who bid: Pro. Get the free beta →
Bid results from DDC, NYC DOT, TxDOT and more →
Every result, older ones too, on the Port Authority's results page →
Three things to know
- Preliminary, not the awardThe Port Authority posts preliminary bid results as raw price data after each opening. Its page says the listed apparent low bidder may not be the firm awarded the contract.
- No estimate is publishedThe results give the bids only, not the Port Authority's estimate. So this page shows the gap between the low bid and the next one, which tells you how tight the pricing was.
- Who is low tells you who to callThe low bidder on a large contract buys out its subcontracts next. The Port Authority's PDF names that firm, and CallSheet Bids Pro readers get who bid on their call sheet.
Official links
- Port Authority: construction bid results
- Port Authority: business opportunities
- NYS Department of Labor: contractor registration
Official sites only. Rules change: confirm on the official page before you act.
What to do next
Check your Bid-Ready Score: New York →Get this week's New York bids, free during the beta
Questions
Where are Port Authority bid results posted?
On the Port Authority's construction bid results page: one PDF per opening, with the contract number, the bid date and every bidder's total.
Is the apparent low bidder the winner?
Not always. The Port Authority's own page says the listed apparent low bidder may not be the firm awarded the contract. Check the award before you plan around it.
Why are some contracts missing here?
Some work-order contracts are bid as a percentage fee, not a dollar total, so there is no number to compare. Those stay on the Port Authority's page but aren't counted here.
Where does the Port Authority post its open bids?
On its Business Opportunities pages on panynj.gov.