Free construction bid sheet template (print, CSV or Excel)
A bid sheet is the one page where you total your price for a job: the scope you are pricing, the quantities and unit prices, alternates, what you left out, the addenda you have seen and the bid security. This one is free to print or download, with nothing to sign up for.
On a public job, turn in the agency's own bid form. Use this sheet to build your numbers first, then copy them across. On a private job or for a general contractor, this sheet works as the price page of your proposal.
The bid sheet
Print it on letter paper, or download it and fill it in on a computer.
Project and bidder
Base bid
Swipe sideways to see every column.
| Item | Description of work (scope) | Quantity | Unit | Unit price | Amount |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| Base bid total | |||||
Unit prices (only the units the bid form lists)
Swipe sideways to see every column.
| Item | Description of work (scope) | Quantity | Unit | Unit price | Amount |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 |
Alternates (only those the agency lists; write add or deduct in the description)
Swipe sideways to see every column.
| Item | Description of work (scope) | Quantity | Unit | Unit price | Amount |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 |
Exclusions and clarifications
Addenda acknowledged (number and date)
Bid security
Prevailing wage and registration
Signature
Free template from callsheetbids.com. A worksheet, not legal advice: the agency's bid form and notice control.
What each line means
- Scope of workThe work you are pricing, in your words, matched to the bid documents. Price what the plans and specifications describe, no more and no less. Work that belongs to another trade goes in your exclusions, not into your price.
- Exclusions and clarificationsWhat you did not price and the assumptions behind your number. Be careful on public bids: federal sealed bidding says a bid must comply in all material respects with the invitation, and other agencies set their own rules, so write notes there only where the notice allows them.
- AlternatesOptional pieces of the job, such as a larger scope or a different material, that the agency lists on its bid form and asks you to price as an add or a deduct from the base bid. Price only the alternates it lists, and say which way each one moves the total.
- Unit pricesA price for one unit of work (per cubic yard, per linear foot, per fixture) that the agency can use to adjust the contract if the real quantity differs from its estimate. Fill in only the units the bid form lists, and keep them in line with your base bid.
- Addenda acknowledgedAddenda are the changes an agency issues after the notice comes out. Bid forms ask you to list each one by number and date, and a missed addendum can get a bid thrown out. Federal sealed bids work the same way: changes come as amendments to the invitation.
- Bid securityA bond or a check that backs your bid, so the agency is protected if the low bidder walks away. The notice names the form and the amount, as a percentage of your bid. Federal jobs follow FAR 28.101-2, and the SBA guarantees surety bonds for small firms that qualify.
FAR 28.101-2: bid guarantee on federal jobs · SBA Surety Bond Guarantee program
- Prevailing wage and registrationThe minimum wage and benefits the agency requires for each trade on public work. The notice names the schedule, and you price your labor from it. New York public work pays the county's prevailing wage under Labor Law 220, NYC's schedules come from the City Comptroller, and since December 30, 2024 contractors on New York public work register with the State Department of Labor. Texas public works pay prevailing wages under Government Code chapter 2258.
NYS Department of Labor: public work and prevailing wage · NYC Comptroller: prevailing wage schedules · NYS Department of Labor: contractor registration · Texas Government Code chapter 2258
Official links
- FAR 14.301: responsiveness of bids
- FAR 14.208: amendment of invitation for bids
- FAR 28.101-2: bid guarantee on federal jobs
- SBA Surety Bond Guarantee program
- NYS Department of Labor: public work and prevailing wage
- NYC Comptroller: prevailing wage schedules
- NYS Department of Labor: contractor registration
- Texas Government Code chapter 2258
Official sites only. Rules change: confirm on the official page before you act.
Next: how to bid the job
The sheet is the last step. The guide walks the whole bid, from reading the notice to turning it in on time.
What to do next
Check your Bid-Ready Score: New York →Get this week's New York bids, free during the beta
Check your Bid-Ready Score: Texas →Get this week's Texas bids, free during the beta
Questions
Can I turn in this sheet as my bid on a public job?
Usually not. Public agencies require their own bid form, signed and complete. Federal sealed bidding, for one, considers a bid on the bidder's own form only if it accepts all the terms of the invitation (FAR 14.301). Use this sheet to work out your price, then fill in the agency's form.
What is the difference between a bid sheet and a proposal?
A bid sheet is the price page for a sealed or form-based bid. A proposal to a private customer or a general contractor adds a narrative, terms and a schedule. This sheet works as the numbers page of either.
Is the template really free?
Yes. Print it or download the CSV or Excel file. There is nothing to sign up for.
Which file should I download?
The CSV opens in any spreadsheet, including Google Sheets. The Excel file also adds the math: quantity times unit price for each Base bid line, and the total.
Does the sheet cover prevailing wage?
It has a line for the wage schedule you used and your registration number, so the page is complete. The wage rates themselves come from the notice and the agency's schedule; the official links above lead to them.