How to bid a public construction job
Read the notice, get the full bid documents, price the work at the wage the notice requires, and turn in the agency's own bid form, signed, with every addendum acknowledged and the bid security attached, before the deadline.
On most sealed public bids the lowest bid wins, but only if it followed every instruction and the agency judges the firm able to do the job.
Three things to know
- The notice is the rulebookIt gives the due date and time, where and how to submit, whether the pre-bid meeting or site visit is mandatory, the bid security, the license and insurance asked for, and any M/WBE or HUB goals. Read all of it before you price anything.
- Addenda change the jobQuestions go in writing by the question deadline, and the answers come out as addenda that can change the scope or the due date. Get the documents from the agency so you are on its plan-holder list, and acknowledge every addendum on the bid form: a missed one can get the bid thrown out.
- Public work pays prevailing wageNew York public work pays the prevailing wage for the county (Labor Law 220; NYC's schedules come from the City Comptroller). Texas public works pay prevailing wages under Government Code chapter 2258, and federally funded construction over $2,000 pays Davis-Bacon rates. The notice names the schedule; price your labor from it.
What it costs and how long it takes
Getting the documents is free on most public jobs; a few agencies charge a fee or deposit for printed plans, and the notice says. Pricing a small job takes a few days, so start the week the notice comes out: sub and supplier quotes come in late. Bid security is a percentage of your bid that the notice sets. Late bids are not opened, even by a minute.
Official links
- City Record Online: NYC notices
- PASSPort: where many City agencies take bids
- Texas ESBD: State of Texas bid notices
- SAM.gov: federal notices
- NYS Department of Labor: public work and prevailing wage
- NYC Comptroller: prevailing wage schedules
- FAR Part 14: how federal sealed bidding works
- APEX Accelerators: free bidding help, find yours
Official sites only. Rules change: confirm on the official page before you act.
What to do next
Check your Bid-Ready Score: New York →Get this week's New York bids, free during the beta
Check your Bid-Ready Score: Texas →Get this week's Texas bids, free during the beta
Questions
What does responsive and responsible mean?
Responsive: the bid followed the instructions, on the right form, signed, with the bid security and every addendum. Responsible: the firm can do the job, with the license, experience, insurance and money to finish it. The low bid wins only if it is both.
Can I bid if I missed the pre-bid meeting?
Only if the notice says attendance is optional. When it says mandatory, a bid from a firm that was not signed in is usually rejected.
How do I find out who won and for how much?
Most agencies read sealed bids aloud at the bid opening and post a tabulation of every bid. CallSheet Bids prints the winners as leads, so you can call the GC who just won and offer your trade.
Should I bid as a prime or as a sub first?
Many small firms start as subs to the GCs who win, which needs no bid bond of your own, and bid as a prime once they have a bonding line and a few public jobs done.